INSTALLATION OF DN250 TWO-STAGE PRESSURE RELIEF VALVE UNDER TAN TAO BRIDGE, 10 PROVINCIAL ROAD HCMC

19 - 04 -2021
  • Customer: Cho Lon Water Supply Company
  • Time: 2020
  • Scope of supply: Supply and Installation of DN250 two-step pressure reducing valve
  • The results achieved after valve installation:
    – Automatic voltage cut-off mode: automatically cut off pressure after 22 pm to 1.5 bar to protect devices on the network + manage and plan to fix suspected leaks.
    – Automatic voltage booster mode: The pressure increases automatically when the water demand of the population increases during the daytime. Can be combined with datalogger to record online data.

 

Xin chào!
Request counselling
Please leave your information, VUCICO VIETNAM will contact you as soon as possible!