Time: 31/07/2015
Investor: Nha Be Water Supply Joint Stock Company
Address: Phu Xuan bridge – Nha Be Ward
– Installation location at the pipe who across Phu Xuan Bridge (ways to be indispensable exhaust air equipment)
– Air valve installation will avoid pressure loss across the bridge. Keep the flow preserved in front of and behind the bridge. Reducing pump capacity
– Save 5-10% in electricity costs for pumping station
– Fire-resistant plastic materials, shock resistance, anti-corrosion, anti-scaling sediment
– Threaded / flange connection for easy installation – PLUG AND PLAY !