SUPPLY AND INSTALLATION BUTTERFLY VALVE FOR THU DUC WTP – HCMC

19 - 04 -2021

Project Name: Butterfly valve Mueller for Thu Duc WTP Investor: Sai Gon Water Corporation (SAWACO) Time: 2018 Supplied articles: – Butterfly valve Mueller (DN42’’, DN30’’, DN18’’. DN16’’). – Hydraulic actuator Result: – After completion of the project, the valve is renovated, delivers significantly improved operating. Danger of damage and leak…

OPTIMIZATION FOR CLEAN WATER TRANSMISSION PIPELINE IN DIEN VONG WTP – QUANG NINH

19 - 04 -2021

Time: 2018 Address: Quang Ninh Supplied articles: Exhaust valve system, optimize the energy of providing clean water Result: – Solve air clogging in the clean water transmission pipes – Increasing transmission capacity                 [video width="640" height="360" mp4="http://freebackups.tk/assets/uploads/2021/04/VID-20161101-00000-1.mp4"][/video]  

SUPPLY MULTIJOINT COUPLING OF WAGA IN HANOI – VIETNAM

19 - 04 -2021

Customer: HaNoi Water Limited Company Time: 2018 Address: Ha Noi Supplied articles:  the coupling Waga DN300; DN600 Features: – Suitable for different of outside diameters of different pipe materials – Can connect up to a maximum of 8 degree angular deflection – Life up to 50 years – Epoxy Coating…

SUPPLY FLEXIBLE WATER TANK OF PROGRAM ” TOWARD TO HOME SEAS AND ISLANDS” PHU QUOC, CA MAU

19 - 04 -2021

As part of the program “Toward To Home Seas And Islands”, VUCICO supplied and installed 2 flexible water tanks for 2 units “Tho Chu Island – Phu Quoc” and “Hon Chuoi Island – Ca Mau” . With the goal of Supplying and Reserving clean water filtered from rainwater to the…

INSTALLATION OF DN250 TWO-STAGE PRESSURE RELIEF VALVE UNDER TAN TAO BRIDGE, 10 PROVINCIAL ROAD HCMC

19 - 04 -2021

Customer: Cho Lon Water Supply Company Time: 2020 Scope of supply: Supply and Installation of DN250 two-step pressure reducing valve The results achieved after valve installation: – Automatic voltage cut-off mode: automatically cut off pressure after 22 pm to 1.5 bar to protect devices on the network + manage and…

SUPPLY AND INSTALLATION FLOOD PREVENTION VALVE TF1

19 - 04 -2021

Location 1: STATE AUDIT REGION IV OFFICE BUILDING (49 – Pasteur, Nguyen Thai Binh Ward, District 1) Content 1: Install Flood Prevention Valve TF1 DN150 Location 2: Steering Center of Urban Flood Control Program of Ho Chi Minh City (SCFC). Content 2: Install Flood Prevention Valve TF1 DN600 Use of…

SUPPLY AND INSTALLATION OF FILTRATION AND DISINFECTION SYSTEM FOR DOMESTIC WATER – QUARTER 1 2020

19 - 04 -2021

Client at District 2 – Position: under the kitchen cabinet – Service: washing food, drinking at the tap. Client at Binh Tan District Position: after the radiator, on the roof Service: washing food, bathing and washing     Client at Go Vap District Position: after the radiator, on the roof…

PROJECT CHAIN OF SETTING DMA NETWORK DISTRIBUTION SYSTEM

19 - 04 -2021

VUCICO has implemented projects on partition, network separation for many water supply systems to improve resistance to water loss and to help manage the network more effectively.\ THU DAU MOT, BINH DUONG Name of construction: Supply and installation of DMA pressure regulating system in Binh Duong Investor: Binh Duong Water…