SUPPLY AND INSTALL FLEXIBLE TANK IN HA GIANG
Investor: Ha Giang Clean Water Center Location: Ha Giang Time: 2016 Supplied articles: Flexible storage tanks 100m3 and 500m3
SUPPLY AND INSTALL GRANULAR CHLORINE SYSTEM FOR MY XUYEN 2 WTP (2000m3/day)
Location: Tri Nguyên Island – Khanh Hoa Time: 2018 Supplied articles: – Supplying and installing automatic chlorine granular mixer ChloRun (ICL) – Supplying chloride seeds ChloRun 3000m3 / day – Installation of alarm system and remote monitoring via Web (Sofrel) Results: The system operates more stably, accurately, safely and efficiently…
INSTALLATION THE UV DISINFECTION SYSTEM AT DI AN WASTE WATER TREATMENT PLANT – BINH DUONG
Investor: Binh Duong Environment Water Joint Stock Company Adress: Di An, Binh Duong Time: 2018 Article: Supply and install UV wastewater disinfection system Capacity: 20,000m3/day Features self-wash, remote alarm; lamp power 250W Efficiency after system installation: – As a result, after installing the system, the amount of coliforms in the…
SUPPLY AND INSTALL FILTRATION AND DOMESTIC WATER DISINFECTION SYSTEM – QUARTER 4 2019
Client at Tan Phong ward, District 7Capacity: 300 l / dayInstallation location: under the kitchen cabinet Serving needs: washing food, drinking at the tap. Client at Ward 6, District 3 Capacity: 1 m3 / day Installation location: behind the radiator on the roof Serving needs: using general water (washing face,…
MONITORING THE FLOW AND PRESSURE THROUGHOUT QUY NHON CITY AND NEIGHBORING DISTRICTS
The management of water supply network is now an important and modern trend in the 4.0 era, especially in the #Socialdistancing phase – the period where all jobs are required to work remotely. Time: 2017 Location: Quy Nhon City and Neighboring Districts Investor: Binh Dinh Water Supply Joint Stock Company…
SUPPLY AND INSTALL OF WASTE WATER DISINFECTION SYSTEM AT THAM LUONG BEN CAT
• Investor: SFC Phu Đien • Location: Tham Luong WTP – Ben Cat, District 12, HCMC • Time: 2018 • Supplied articles: Supply and installation of wastewater disinfection system with capacity of 250,000 m3 / day and night • Efficiency achieved: – As a result, after installing the system, the…
UNDERGROUND SURVEY UTILITY FOR CONSTRUCTION – WATER SUPPLY NETWORK MANAGEMENT
The company realized nearly 500 large and small projects extend across the country, therein underground structure detection is the one of the typical projects of VUCICO. VUCICO be always proud to be the top unit in the Underground Survey Detection with prestige always on top of the job. Staffs and…
CONSTRUCTION THE VOLUTE PRESS SLUDGE DEWATERING SYSTEM AT PHU TAI WTP – BINH DINH PROVINCE
Address : Phu Tai WTP – Binh Dinh Time: 2019 Installation system: Sludge press volute machine system AMCON from Japan Capacity: 30,000 m3/day Basic characteristics of the installation system: – Smooth operation – Extremely low power consumption – All-in-one compact integrated system, completely replacing the traditional processing system – No…
SUPPLY THE ENGTEX’S PIPES COATING PU AT NGUYEN HUE WALKING STREET – HCMC
The company realized that nearly 500 large and small projects extend across the country. VUCICO be always proud to be the top unit in the Water Supply and Sewerage Sector with prestige always on top of the job. According to the request of the investor – Ben Thanh Water Supply…
SUPPLY AND INSTALL AIR VALVE FOR TRANSMISSION PIPE AT PHU XUAN BRIDGE – NHA BE WARD
Time: 31/07/2015 Investor: Nha Be Water Supply Joint Stock Company Address: Phu Xuan bridge – Nha Be Ward – Installation location at the pipe who across Phu Xuan Bridge (ways to be indispensable exhaust air equipment) – Air valve installation will avoid pressure loss across the bridge. Keep the flow…